Green Building ConstructionNew York · LLC
Fire Escape (Fire Skip) Restoration & DOB Compliance
Division 05 · Life-Safety Egress & Structural Iron Restoration

NYC DOB-Certified Fire Escape (Fire Skip) Restoration, Scraping & Iron Repairs.

Full-service fire escape and fire skip restoration across all 5 NYC boroughs: mechanical scraping down to bare iron, lead paint encapsulation, direct-to-metal rust-inhibiting urethane enamel, structural steel welding, drop ladder counterweight testing, and 5-year DOB structural inspection sign-offs.

(212) 847-9200
DOB FilingNYC DOB Fire Escape Repair / Work Permit / 5-Year Certification
Typical Timeline1 to 3 weeks depending on building story count and number of egress tiers
Warranty10-Year Anti-Corrosive Coating Warranty & 100% DOB Violation Dismissal Guarantee
Trade Overview

Built specifically to withstand New York’s rigorous structural and environmental demands.

In New York City, exterior fire escapes (commonly termed fire skips) provide vital emergency egress for multi-family residential, commercial, and mixed-use buildings. Continuous exposure to humid summers, winter blizzards, salt air, and freeze-thaw cycles causes severe rust jacking, corroded cantilever support brackets, cracked step treads, frozen drop ladder pulleys, and peeling hazardous lead paint. Under NYC Building Code Article 107 and Department of Buildings regulations, property owners are legally required to maintain fire escapes in structurally sound working order and undergo mandatory structural stability inspection certification every 5 years. Green Building Construction LLC delivers complete turnkey fire escape restoration: our OSHA-30 certified crews mechanically scrape iron components down to bare metal (SSPC-SP 2/SP 3), replace fatigued bolts with Grade 8 galvanized hardware, weld structural sister angles, apply industrial zinc-rich primers and heavy direct-to-metal urethane enamels, calibrate drop ladder counterweights, and secure full DOB violation dismissals.

Why NYC Property Owners Choose Us
NYC DOB 5-Year Fire Escape Structural Inspection Support & Documentation
Resolution of Active DOB, ECB & FDNY Fire Egress Violations
Mechanical Scraping to Bare Iron with Comprehensive Safety Containment
Industrial Zinc-Rich Anti-Corrosive Primers & Direct-to-Metal (DTM) Urethane Enamel
Drop Ladder Counterweight Calibration, Cable Replacement & Free-Fall Safety Tests
Structural Steel Welding, Tread Sistering & Through-Wall Masonry Anchor Plates

Specialized Trade Divisions

Full in-house tool and crew inventory
Mechanical Hand-Scraping & Wire-Brushing to Bare Iron (SSPC-SP 2 / SP 3)
Paint Encapsulation & Sidewalk Debris Catchment Containment Protocols
High-Performance Industrial Zinc-Rich Epoxy Primers & Direct-to-Metal Polyurethane
Structural Steel Cantilever Pin Replacement, Welding & Bracket Reinforcement
Drop Ladder Counterweight Cable Rigging, Guide Rail Alignment & Free-Drop Testing
Through-Wall Structural Masonry Anchor Plates & High-Strength Epoxy Grouting
Suspended Swing-Stage Scaffolding & Pipe Scaffolding Rigging Logistics
NYC DOB 5-Year Inspection Support & Structural Sign-Off Coordination
Headquartered at 558 Van Nest Ave, Bronx, NY. All projects operate under strict NYC DOB, OSHA, and environmental standards.
Field Execution

Authentic Craftsmanship. Verified Project Photos.

Direct evidence of our teams working across New York residential rooftops, brownstone facades, concrete flatwork, and luxury interiors.

Fire Escape (Fire Skip) Restoration & DOB Compliance field execution view 1
NYC Field Verification · 01Fire Escape (Fire Skip) Restoration & DOB Compliance
Fire Escape (Fire Skip) Restoration & DOB Compliance field execution view 2
NYC Field Verification · 02Fire Escape (Fire Skip) Restoration & DOB Compliance
Fire Escape (Fire Skip) Restoration & DOB Compliance field execution view 3
NYC Field Verification · 03Fire Escape (Fire Skip) Restoration & DOB Compliance
Scope & Specifications

What’s Included in Every Project

We believe in complete line-item transparency. Here is exactly what our crews deliver at each phase of your project.

DELIVERABLE 01

Engineering Inspection & Ultrasonic Metal Testing

Comprehensive structural audit of all fire escape tiers, evaluating bracket wall penetrations, step tread deflection, rust pitting, and drop ladder mechanics prior to mobilization.

Included in Baseline Scope
DELIVERABLE 02

Environmental Containment & Surface Preparation

Erecting pedestrian sidewalk bridges and heavy-duty tarps to catch paint chips in compliance with NYC environmental safety regulations, mechanically scraping peeling layers down to sound iron.

Included in Baseline Scope
DELIVERABLE 03

Structural Iron Repairs & Welding

Cutting out fatigued steel members, replacing rusted bracket bolts with Grade 8 galvanized hardware, welding sister angles to reinforced treads, and securing through-wall plates.

Included in Baseline Scope
DELIVERABLE 04

Two-Coat High-Performance Industrial Coating

Application of Rust-Oleum industrial zinc-rich rust-inhibiting primer followed by heavy-duty direct-to-metal (DTM) aliphatic urethane gloss black enamel engineered for 10+ year salt and UV defense.

Included in Baseline Scope
DELIVERABLE 05

Drop Ladder Operational Drop Test & DOB Filing

Calibrating counterweight balance, lubricating pulleys, performing live drop tests from the lowest landing, and submitting certified inspection reports to the NYC Department of Buildings.

Included in Baseline Scope
Specified Materials & Commercial Systems

Premium Grade Architectural Products

Rust-Oleum High-Performance Industrial Zinc-Rich Cold Galvanizing Primer
Direct-to-Metal (DTM) Industrial Aliphatic Polyurethane Gloss Black Finish
ASTM A36 Hot-Rolled Structural Steel Angles, Channels & Grating Treads
Grade 8 Structural Hot-Dip Galvanized Hex Cap Bolts, Washers & Castle Nuts
Hilti HIT-HY 200-R High-Load Structural Epoxy Adhesive for Masonry Tie-Ins
Stainless Steel Aircraft-Grade 7x19 Flexible Wire Rope for Counterweight Rigging
Execution Methodology

Predictable 4-Stage Project Sequencing

How we move your property from initial inspection and municipal filings to watertight sign-off.

01

On-Site Egress Audit & Violation Review

Our superintendent conducts an exhaustive multi-point physical survey of every platform, railing, step, drop ladder, and wall anchor, reviewing any open DOB violation summonses.

02

Site Rigging & Sidewalk Pedestrian Protection

Deploying OSHA-compliant suspended swing stage scaffolds or pipe scaffolds with safety catch netting, drop cloths, and DOB-permitted sidewalk sheds where required.

03

Mechanical Scraping & Structural Ironwork

Aggressive pneumatic wire-brushing and scraper preparation to remove oxidized flaking iron, followed by structural welding, bolt replacement, and step reinforcement.

04

Direct-to-Metal Priming & Industrial Enamel

Applying heavy zinc-rich rust-inhibiting primer to seal all seams and joints, topped with dual coats of UV-resistant black direct-to-metal industrial aliphatic urethane.

05

Drop Ladder Drop Test & DOB Certification Sign-Off

Performing official drop ladder counterweight safety drop test, obtaining engineer certification stamp, and filing paperwork directly with the NYC DOB for full dismissal.

Proven Track Record

Selected Project Highlights

Crown Heights 4-Story Fire Escape RestorationCrown Heights, Brooklyn, NY

Crown Heights 4-Story Fire Escape Restoration

Scope: Full wire-brush scraping, bracket bolt replacement, parapet rebuild, and dual urethane coating across a 4-tier historic residential facade.

Outcome: 100% dismissal of DOB fire escape safety violation within 30 days.

Full NYC Inspection Sign-OffVerified Complete ✓
Astoria Steel Egress Staircase & PlatformAstoria, Queens, NY

Astoria Steel Egress Staircase & Platform

Scope: Custom shop-welded ASTM A36 structural steel secondary egress staircase with diamond checker plate treads and continuous safety handrails.

Outcome: Passed full NYC Building Code Chapter 10 egress inspection with zero defects.

Full NYC Inspection Sign-OffVerified Complete ✓
Technical & Permitting FAQs

Frequently Asked Questions

Clear answers regarding permits, timelines, costs, and materials for Fire Escape (Fire Skip) Restoration & DOB Compliance.

Under NYC Building Code (including Article 107 and 1 RCNY § 103-04), all exterior fire escapes and safety egress systems must undergo a comprehensive structural inspection every 5 years by a registered professional engineer (PE) or registered architect (RA). The inspection certifies that all cantilever brackets, drop ladders, railings, and treads can safely support designated live loads.
Direct Trade Desk

Request an Onsite Estimate for Fire Escape (Fire Skip) Restoration & DOB Compliance

Serving the Bronx, Manhattan, Brooklyn, Queens & Staten Island. Free detailed inspection.

Direct contractor contact. No sales third-parties.