Green Building ConstructionNew York · LLC
Commercial · Building Envelope RemediationLong Island City, Queens, NY

Commercial Façade Cavity Wall Remediation & Weather Barrier

Vapor-Permeable Air Barrier, Stainless Wall Ties, Cavity Drainage & Lintel Flashing

Zero Leakage
ASTM E1105 Water Penetration Test Cleared
Project Parameters
Square Footage2,800 sq ft Wall Elevation
Execution Timeline3.5 Weeks
Borough / DistrictQueens
Execution StandardMaster In-House Trades
Commercial Façade Cavity Wall Remediation & Weather Barrier
Field Photo: Long Island City Case StudyGeneral Contractor: Green Building Construction LLC
01 / The Condition

Site Constraints & Engineering Challenge

A multi-story commercial facility experienced persistent water infiltration through the outer brick wythe during wind-driven rains, causing inner wall dampness and degrading structural steel lintels.

02 / Execution

The Construction & Field Strategy

Green Building Construction cut back compromised exterior brick courses, remediated corroded structural shelf angles, applied DuPont Tyvek CommercialWrap vapor-permeable weather barrier with sealed taped seams, installed high-grade stainless steel masonry anchors, mortar drop netting, and integrated end-dam flashings with weep tubes.

Key Technical Details
Dismantling of exterior brick wythe without disrupting interior tenant operations
Surface preparation and rust removal from structural steel lintel shelf angles
Continuous Tyvek CommercialWrap air & water barrier installation with Tyvek tape sealing
High-deflection stainless steel barrel-screw masonry wall ties installed into metal studs
Mortar Net drainage matrix prevents mortar droppings from clogging lower weep vents
03 / Specifications

Materials & Structural Specifications

Weather BarrierDuPont Tyvek CommercialWrap high-performance vapor-permeable membrane
Masonry TiesHeckmann Building Products POS-I-TIE stainless steel screw anchors
Flashing MembraneGrace Vycor Plus self-adhering 40-mil rubberized asphalt flashing
Cavity DrainageMortar Net 1-inch continuous drainage mesh with clear weep vent inserts
04 / Verified Metrics

Documented Project Results

100% dry interior confirmed following ASTM E1105 field water spray testing
Prevented future rusting of structural steel perimeter beams and window lintels
Restored thermal integrity and reduced building envelope heating losses
Visual Documentation

Field Progress & Finished Details

Click any photo to inspect full uncropped high-resolution jobsite details.

Commercial brick cavity wall remediation featuring Tyvek CommercialWrap air barrier, continuous insulation, stainless steel brick ties, and shelf angle flashing.
View Full Resolution

Commercial brick cavity wall remediation featuring Tyvek CommercialWrap air barrier, continuous insulation, stainless steel brick ties, and shelf angle flashing.