Green Building ConstructionNew York · LLC
Commercial · Flat Roofing & WaterproofingMaspeth, Queens, NY

Industrial Flat Roof SBS Bitumen Membrane & Parapet Waterproofing

Torch-Applied 2-Ply SBS Cap Sheet, Aluminum Flashing, Coping Stone Seal & Drain Sumps

25-Year NDL
Manufacturer No Dollar Limit Roofing Warranty
Project Parameters
Square Footage5,800 sq ft Roof Deck
Execution Timeline3 Weeks
Borough / DistrictQueens
Execution StandardMaster In-House Trades
Industrial Flat Roof SBS Bitumen Membrane & Parapet Waterproofing
Field Photo: Maspeth Case StudyGeneral Contractor: Green Building Construction LLC
01 / The Condition

Site Constraints & Engineering Challenge

An industrial warehouse roof suffered from blistering old asphalt coatings, ponding water along the perimeter parapet walls, and leaking drain sumps that threatened commercial inventory below.

02 / Execution

The Construction & Field Strategy

We performed a complete tear-off down to structural concrete decking, installed tapered polyisocyanurate rigid insulation to eliminate standing ponding water, applied an SBS modified bitumen base sheet, and torch-welded a heavy-duty granulated cap sheet with 12-inch parapet vertical flashing, aluminum counter-flashings, and new cast-iron clamping roof drains.

Key Technical Details
Tapered polyisocyanurate insulation creating positive 1/4-inch per foot slope toward drains
Dual-ply SBS modified bitumen roofing system with ceramic-granule UV protective cap sheet
Parapet wall base flashings turned up 12 inches with cant strips and mechanical termination bars
Heavy-gauge aluminum coping stone slip-covers with watertight standing seams
Heavy-duty cast-iron clamping ring roof drains with integrated gravel guards
03 / Specifications

Materials & Structural Specifications

Primary MembraneSiplast Paradiene 20/30 SBS modified bitumen 2-ply roofing system
Roof InsulationGAF EnergyGuard tapered Polyiso boards (R-30 thermal value)
Flashing & Coping.040-inch Kynar 500 prefinished architectural aluminum
Drainage BasinZurn 15-inch heavy cast-iron interior roof drain bodies with clamping rings
04 / Verified Metrics

Documented Project Results

Achieved 25-Year Manufacturer No Dollar Limit (NDL) system warranty
Eliminated 100% of water ponding across 5,800 square feet of flat roof area
Passed full 24-hour flood test inspection with zero moisture ingress
Visual Documentation

Field Progress & Finished Details

Click any photo to inspect full uncropped high-resolution jobsite details.

Finished torch-applied SBS granulated cap sheet flat roof with seamless welded seams and parapet turn-ups.
View Full Resolution

Finished torch-applied SBS granulated cap sheet flat roof with seamless welded seams and parapet turn-ups.

Verified On-Site Video Walkthrough

Field Video Walkthrough: Commercial Flat Roof Inspection

Superintendent walkthrough inspecting the freshly completed 2-ply SBS torch-down cap sheet, parapet wall base flashings, coping cap seals, and roof drain basins.

Field Walkthrough · Green Building Construction LLC1080p Stream