Multi-Tier Scaffolding Brick Pointing & Structural Lintel Reconstruction
Diamond-Blade Mortar Raking with Vacuum Containment, Structural Lintel Demolition & Entrance Archway Rebuilding

Site Constraints & Engineering Challenge
An 80-year-old multi-family brick residence suffered from severe water ingress along its side alleyway elevation. Decades of weathering had turned the lime mortar into crumbling powder, while rusted structural steel window lintels had expanded ('rust jacking'), cracking open brick courses above basement and entrance openings.
The Construction & Field Strategy
Green Building Construction erected a full multi-tier tubular pipe scaffolding system complete with safety guardrails and ladder access. To protect neighbors and comply with OSHA Table 1 crystalline silica mandates, our masons used diamond raking wheels fitted with point-of-origin vacuum extraction. We systematically dismantled failed brick courses over basement windows and entrance door headers, removed the corroded lintels, set new hot-dip galvanized structural angles with self-adhering end-dam flashings, and repointed the entire facade with breathable Type N mortar strike-tooled with concave joints.
Materials & Structural Specifications
Documented Project Results
Field Progress & Finished Details
Click any photo to inspect full uncropped high-resolution jobsite details.

Masons on multi-tier pipe scaffolding executing mortar joint grinding and brick restoration with blue protective ground tarps.

Excavation and structural scaffolding staging around residential doorway arch and lintel replacement.

Side alleyway overview showing staging, safety ladders, lintel remediation, and active elevation work.

Close-up of OSHA-compliant masonry joint raking with diamond blades and dust collection.

Basement window structural lintel removal and sound masonry substrate preparation.

Exterior entryway arch and doorway header preparation for reinforced structural lintel.
Field Video: Full Jobsite Walkthrough & Scaffolding Masonry Operations
Comprehensive 14-second on-site superintendent walkthrough along the side elevation showing multi-tier pipe scaffolding, active diamond-wheel joint raking, basement lintel demolition, and debris containment.
On-Site Step-by-Step Field Video Logs
Inspect each stage of work captured on-site — structural framing, bituminous waterproofing, and final scuttle installation.
Diamond-Blade Mortar Raking & HEPA Dust Shroud Evacuation
Certified masons in full PPE operate diamond grinders with integrated vacuum hoods to rake compromised mortar joints to uniform 3/4-inch depth without damaging adjacent brick arrises.
Basement Window Lintel Demolition & Substrate Prep
Removal of corroded, expanded steel lintel and spalled foundation bricks around basement fenestration, clearing debris onto heavy-duty tarps to prepare for new galvanized angle steel.
Doorway Arch & Structural Header Masonry Prep
Scaffold-supported excavation of fatigued masonry arch and header above the residential entrance stair landing, protected by heavy weather barrier poly tarps.