Multi-Tier Scaffolding Brick Pointing & Structural Lintel Reconstruction

Diamond-Blade Mortar Raking with Vacuum Containment, Structural Lintel Demolition & Entrance Archway Rebuilding

Zero Dust / 100% Sealed
OSHA Silica Compliant HEPA Extraction & Structural Restoration
Project Parameters
Square Footage2-Story Full Side Elevation & Entryway
Execution Timeline2 Weeks
Borough / DistrictBrooklyn
Execution StandardMaster In-House Trades
Multi-Tier Scaffolding Brick Pointing & Structural Lintel Reconstruction
Field Photo: Crown Heights / Ridgewood Border Case Study (Full Vertical Capture)Zero Cropping · Original 9:16 Ratio
01 / The Condition

Site Constraints & Engineering Challenge

An 80-year-old multi-family brick residence suffered from severe water ingress along its side alleyway elevation. Decades of weathering had turned the lime mortar into crumbling powder, while rusted structural steel window lintels had expanded ('rust jacking'), cracking open brick courses above basement and entrance openings.

02 / Execution

The Construction & Field Strategy

Green Building Construction erected a full multi-tier tubular pipe scaffolding system complete with safety guardrails and ladder access. To protect neighbors and comply with OSHA Table 1 crystalline silica mandates, our masons used diamond raking wheels fitted with point-of-origin vacuum extraction. We systematically dismantled failed brick courses over basement windows and entrance door headers, removed the corroded lintels, set new hot-dip galvanized structural angles with self-adhering end-dam flashings, and repointed the entire facade with breathable Type N mortar strike-tooled with concave joints.

Key Technical Details
Engineered tubular steel multi-tier pipe scaffolding with OSHA safety handrails and ladder enclosures
Heavy-duty continuous blue poly ground tarps protecting asphalt, catching 100% of brick and mortar rubble
OSHA Table 1 compliant point-of-origin dust vacuum hoods attached to angle grinders during mortar raking
Controlled demolition of spalled water-table brick courses and rusted steel basement window lintels
Careful shoring and excavation of entryway doorway header and decorative brick arch masonry
Installation of ASTM A36 hot-dip galvanized structural steel lintels with end-dam flashing membranes
Concave joint tooling compressing the mortar surface for maximum resistance to driving rain penetration
03 / Specifications

Materials & Structural Specifications

Scaffolding InfrastructureSafway / Bil-Jax heavy-duty tubular steel frame scaffolding with non-slip aluminum planks
Joint Raking ToolsHilti diamond mortar raking blades with OSHA-rated HEPA dust collection extractors
Structural Window LintelsASTM A36 4x4x3/8-inch hot-dip galvanized steel angle lintels
Tuckpointing MortarQuikrete Commercial Grade Type N masonry cement with custom iron-oxide color pigment
Through-Wall FlashingGrace Perm-A-Barrier self-adhering 40-mil rubberized asphalt flashing membrane
04 / Verified Metrics

Documented Project Results

100% elimination of moisture leaks into basement and exterior perimeter wall cavities
Zero airborne silica dust complaints from neighbors, fully compliant with NYC environmental safety rules
Structural stability restored to window openings and doorway arches with rust-proof galvanized steel lintels
Restored architectural brickwork enhancing curb appeal and property market value for decades to come
Visual Documentation

Field Progress & Finished Details

Click any photo to inspect full uncropped high-resolution jobsite details.

Masons on multi-tier pipe scaffolding executing mortar joint grinding and brick restoration with blue protective ground tarps.
View Full Resolution

Masons on multi-tier pipe scaffolding executing mortar joint grinding and brick restoration with blue protective ground tarps.

Excavation and structural scaffolding staging around residential doorway arch and lintel replacement.
View Full Resolution

Excavation and structural scaffolding staging around residential doorway arch and lintel replacement.

Side alleyway overview showing staging, safety ladders, lintel remediation, and active elevation work.
View Full Resolution

Side alleyway overview showing staging, safety ladders, lintel remediation, and active elevation work.

Close-up of OSHA-compliant masonry joint raking with diamond blades and dust collection.
View Full Resolution

Close-up of OSHA-compliant masonry joint raking with diamond blades and dust collection.

Basement window structural lintel removal and sound masonry substrate preparation.
View Full Resolution

Basement window structural lintel removal and sound masonry substrate preparation.

Exterior entryway arch and doorway header preparation for reinforced structural lintel.
View Full Resolution

Exterior entryway arch and doorway header preparation for reinforced structural lintel.

Verified On-Site Video Walkthrough

Field Video: Full Jobsite Walkthrough & Scaffolding Masonry Operations

Comprehensive 14-second on-site superintendent walkthrough along the side elevation showing multi-tier pipe scaffolding, active diamond-wheel joint raking, basement lintel demolition, and debris containment.

Field Walkthrough · Green Building Construction LLCVertical 9:16 Field Video
Individual Construction Phase Clips

On-Site Step-by-Step Field Video Logs

Inspect each stage of work captured on-site — structural framing, bituminous waterproofing, and final scuttle installation.

Phase 010:09

Diamond-Blade Mortar Raking & HEPA Dust Shroud Evacuation

Certified masons in full PPE operate diamond grinders with integrated vacuum hoods to rake compromised mortar joints to uniform 3/4-inch depth without damaging adjacent brick arrises.

Phase 020:03

Basement Window Lintel Demolition & Substrate Prep

Removal of corroded, expanded steel lintel and spalled foundation bricks around basement fenestration, clearing debris onto heavy-duty tarps to prepare for new galvanized angle steel.

Phase 030:05

Doorway Arch & Structural Header Masonry Prep

Scaffold-supported excavation of fatigued masonry arch and header above the residential entrance stair landing, protected by heavy weather barrier poly tarps.