Green Building ConstructionNew York · LLC
Commercial & Multi-Family · Façade Restoration504 Marcy Ave, Brooklyn, NY

High-Rise Brick Façade & Parapet Restoration via Genie Boom Lift

NYC DOB FISP Local Law 11 Compliance, Articulating Boom Lift Staging, Parapet Masonry & Fenestration Protection

100% Compliant
NYC DOB FISP / Local Law 11 Certified
Project Parameters
Square Footage7-Story Multi-Family Exterior Elevation
Execution Timeline3 Weeks
Borough / DistrictBrooklyn
Execution StandardMaster In-House Trades
High-Rise Brick Façade & Parapet Restoration via Genie Boom Lift
Field Photo: Williamsburg / Bedford-Stuyvesant Case Study (Full Vertical Capture)Zero Cropping · Original 9:16 Ratio
01 / The Condition

Site Constraints & Engineering Challenge

A 7-story pre-war multi-family apartment building at 504 Marcy Ave in Brooklyn faced severe weather deterioration along its upper brick masonry and roofline parapet wall. Facing mandatory NYC Department of Buildings (DOB) Facade Inspection & Safety Program (FISP / Local Law 11) cycles, the owner needed swift repairs to loose brickwork, failing mortar joints, and spalled lintels without erecting disruptive, expensive pipe scaffolding across the busy sidewalk.

02 / Execution

The Construction & Field Strategy

Green Building Construction engineered an aerial access strategy utilizing an 80-foot Genie Z-80/60 articulating boom lift. This allowed our certified crew to access every level of the vertical facade while preserving continuous sidewalk pedestrian access below. We masked and taped heavy-duty protective poly sheeting over all residential windows to shield tenant glass and AC units, carefully raked out decayed mortar, replaced cracked face bricks with severe-weather ASTM C216 units, repointed joints with breathable Type N mortar, and sealed parapet coping stones with Sikaflex NP-1 elastomeric polyurethane.

Key Technical Details
Deployment of Genie Z-80/60 articulating boom lift providing 84-foot working height and 60-foot horizontal outreach
Full street-level OSHA pedestrian safety zone with high-visibility barricades, cones, and caution tape
Tightly taped protective poly sheeting installed over all residential window fenestrations and air conditioning units
Raking and repointing of damaged parapet and upper-floor brick mortar joints down to sound substrate
Structural inspection and rust-inhibitive coating applied to exposed steel window lintels
Polyurethane elastomeric sealants applied along horizontal coping stones to eliminate freeze-thaw penetration
03 / Specifications

Materials & Structural Specifications

Aerial Access EquipmentGenie Z-80/60 4WD articulating boom lift with 500-lb platform capacity
Masonry UnitsASTM C216 Grade SW severe-weather red architectural face brick
Restoration MortarSpec Mix Type N historic-compatible lime-rich portland mortar
Joint SealantSika Sikaflex NP-1 high-performance elastomeric polyurethane sealant
Glazing Protection6-mil heavy-duty rip-resistant poly sheeting with clean-release exterior tape
04 / Verified Metrics

Documented Project Results

Full NYC DOB FISP / Local Law 11 structural sign-off achieved with zero violations
Saved property owner over $35,000 in pipe scaffolding permits, sidewalk shed, and staging overhead
Zero disruption to ground-floor pedestrian traffic or tenant access during the 3-week repair window
100% weather-sealed parapet wall preventing winter freeze-thaw spalling and interior moisture damage
Visual Documentation

Field Progress & Finished Details

Click any photo to inspect full uncropped high-resolution jobsite details.

Genie Z-80/60 articulated boom lift basket positioned at the 7th floor roofline of 504 Marcy Ave, with protected tenant windows under clear blue sky.
View Full Resolution

Genie Z-80/60 articulated boom lift basket positioned at the 7th floor roofline of 504 Marcy Ave, with protected tenant windows under clear blue sky.

Ground-level inspection showing telescopic boom reach, hydraulic chassis stability, and pedestrian barrier staging.
View Full Resolution

Ground-level inspection showing telescopic boom reach, hydraulic chassis stability, and pedestrian barrier staging.

Verified On-Site Video Walkthrough

Field Video: Articulating Boom Lift Façade & Parapet Inspection

Superintendent video walkthrough documenting 80-foot articulating Genie Z-80/60 boom lift deployment, pedestrian safety zone, protective window masking, and top-tier parapet masonry restoration at 504 Marcy Ave in Brooklyn.

Field Walkthrough · Green Building Construction LLCVertical 9:16 Field Video