Commercial · Flat Roofing & WaterproofingGrand Concourse, Bronx, NY

Commercial Rooftop Access Hatch & Watertight Curb Flashing

Heavy-Gauge Insulated Steel Roof Scuttle, Structural Curb Framing & Sikaflex Polyurethane Flashing Waterproofing

100% Watertight
ASTM D5957 Flood & Moisture Tested
Project Parameters
Square Footage6-Story Building Roof Access Shaft
Execution Timeline3 Days
Borough / DistrictBronx
Execution StandardMaster In-House Trades
Commercial Rooftop Access Hatch & Watertight Curb Flashing
Field Photo: Grand Concourse Case Study (Full Vertical Capture)Zero Cropping · Original 9:16 Ratio
01 / The Condition

Site Constraints & Engineering Challenge

A 6-story multi-family residential building in the Bronx suffered from severe chronic water leaks infiltrating the top-floor common stairwell during heavy rainstorms. The original 35-year-old steel roof scuttle was severely rusted, its wooden curb rotted from seasonal moisture, and failed perimeter flashings allowed water to channel directly down the interior structural egress shaft.

02 / Execution

The Construction & Field Strategy

Green Building Construction expedited a complete emergency roof hatch overhaul. Our envelope crew removed the fatigued metal hatch and deteriorated wood curb, reconstructed a heavy-duty treated wood curb with 12-inch vertical clearance above the roof deck, flashed the perimeter with SBS modified bitumen membranes, and sealed all lap joints with Sikaflex NP-1 polyurethane sealant. We then bolted an insulated, heavy-gauge galvanized steel roof scuttle with gas-spring counterbalanced lift mechanisms, internal safety slam latches, padlocking hasps, and heavy-duty EPDM weather gaskets.

Key Technical Details
Precision demolition of compromised legacy metal scuttle and rotted curb framing
Fabrication of treated structural lumber curb box anchored into structural roof framing
Bituminous base flashing wrap with continuous Sikaflex NP-1 elastomeric polyurethane joint sealant
Installation of insulated heavy-gauge galvanized steel roof access hatch with hold-open arm
Dual gas-spring compression cylinders calibrated for smooth 1-hand opening and controlled closure
EPDM weather-tight perimeter bulb gasket sealing out driving rain, snow melt, and thermal drafts
03 / Specifications

Materials & Structural Specifications

Roof Access ScuttleBabcock-Davis / Bilco Type S 36x30 insulated galvanized steel roof scuttle with gas spring assist
Perimeter Joint SealantSika Sikaflex NP-1 high-performance non-sag polyurethane elastomeric sealant
Curb Flashing MembraneSBS modified bitumen cold-applied self-adhering perimeter base and cap flashing
Structural Framing#2 Southern Yellow Pine treated dimensional lumber with hot-dip galvanized fasteners
Hardware & GasketingHeavy-duty zinc-plated slam latch, interior pull handle, padlock hasp, and EPDM bulb gasket
04 / Verified Metrics

Documented Project Results

100% elimination of rain penetration down the 6-story interior stairwell shaft
Full compliance with NYC Building Code Section 1011.12 roof access and safety egress regulations
Smooth, effortless 1-hand opening operation calibrated by dual gas-spring compression shocks
Passed ASTM D5957 24-hour flood and hose spray water penetration test with zero dampness
Visual Documentation

Field Progress & Finished Details

Click any photo to inspect full uncropped high-resolution jobsite details.

Fully installed commercial roof hatch open under sunny skies, showing gas-spring lift cylinders, Sikaflex NP-1 sealant, and surrounding flat roof membrane.
View Full Resolution

Fully installed commercial roof hatch open under sunny skies, showing gas-spring lift cylinders, Sikaflex NP-1 sealant, and surrounding flat roof membrane.

Curb perimeter inspection showing watertight flashing integration and view down into the interior roof access ladder shaft.
View Full Resolution

Curb perimeter inspection showing watertight flashing integration and view down into the interior roof access ladder shaft.

New structural wood curb box framed squarely over the 6-story building roof opening prior to scuttle mounting.
View Full Resolution

New structural wood curb box framed squarely over the 6-story building roof opening prior to scuttle mounting.

Verified On-Site Video Walkthrough

Field Video: Rooftop Access Scuttle & Flashing Walkthrough

Superintendent video walkthrough documenting the structural curb framing, bituminous base flashing, Sikaflex NP-1 waterproofing, and heavy-gauge insulated roof hatch installation on a 6-story commercial roof.

Field Walkthrough · Green Building Construction LLCVertical 9:16 Field Video
Individual Construction Phase Clips

On-Site Step-by-Step Field Video Logs

Inspect each stage of work captured on-site — structural framing, bituminous waterproofing, and final scuttle installation.

Phase 010:07

Structural Wood Curb Framing & Shaft Access

Removal of deteriorated scuttle and fabrication of a reinforced dimensional lumber curb box anchored into roof joists directly over the 6-story stairway access shaft.

Phase 020:05

Waterproof Bituminous Flashing & Sikaflex Sealing

Application of multi-layer modified bitumen base flashing, cant strip transitions, and continuous bead of Sikaflex NP-1 polyurethane elastomeric sealant along curb seams.

Phase 030:04

Insulated Scuttle Mounting & Hardware Calibration

Securing the heavy-gauge galvanized steel roof hatch, gas-spring counterbalanced lift shocks, interior safety handle, and perimeter weather-tight EPDM gasket.